Construction Update – 11/27/17

from Ryan Nebel, Construction Superintendent

  • Installed all carpet and vinyl flooring
  • Installed dumpster pad
  • Poured concrete aprons and loading dock area
  • Set all light poles
  • Moved wooden shed to final location
  • Completed all HVAC enclosures
  • Completed final paint throughout building
  • Trimmed out electrical, mechanical, and plumbing fixtures
  • Installed all window shades